OML 26 ASSET OVERVIEW

OML 26 is located in the western Niger Delta and covers an area of 480 square kilometres. The producing fields are Ogini and Isoko. Ozoro field was previously produced but was shut-in in 1990 due to high GOR. Ovo and Aboh fields are in advanced stages of planning, to be developed as integrated oil and gas fields. OML 26 is entirely covered by 3D seismic of 1992 vintage. The combined fields currently produce an average of about 10,000-12,000 bopd and 2-5 MMscf/d of associated gas.

The production processing facilities in OML 26 are located at the Ogini field. They consist of a 30,000 bbls/d flowstation, gas compressors, associated flowlines, pipelines and export pumps. At Ogini flowstation, two-phase separation is carried out with liquids exported to Forcados Terminal via the Ughelli Production Station (UPS) and Trans Forcados Pipeline. Dehydration and water disposal are currently carried out outside the license (at Forcados Terminal).

OML26

 

TOP